Traffic decking, EOLE worksite, RER E

LOCAPAL supplies traffic decking for the Eole construction site, RER E station, future Paris Porte Maillot station.

We are responsible for the installation of the Manitou rotoscopes and aerial work platforms, which help to ensure the completeness of the station above the SNCF track via a physical separation:

  • between the lower floors, where the SNCF train is tested, and the lower floors, where the SNCF train is tested.
  • the upper floors, where the station cladding and other finishing work takes place.

Congratulations to the site crews on their installation.

LOCAPAL was responsible for the design, engineering, manufacture and on-site delivery of rented steel structures (steel framework and heavy metal platforms). The temporary decking is 8m high, 8m wide and 70m long.