Installation of eleven formwork tables Assembly of the first section of Locapal formwork tables at Saint-Denis Pleyel station on line 16. We have installed eleven formwork tables since 14/11/2022. The first six tables were assembled earlier, and our customer was able to pour 315 m³ of concrete on them. The last five tables were erected in November/December 2022. Turnkey formwork …