BATIMAT, indirectly, here we are! Locapal built a crane gantry and a pedestrian protection tunnel at the entrance to the Parc expo Paris Porte de Versailles as part of the BESIX worksite for the construction of the Triangle Tower. Designed by Locapal Engineering and Methods. The project, located in the heart of Paris’s 15th arrondissement, is scheduled for completion in the first half of 2026.