Weekend night-time installation of a temporary bridge over railroad tracks, under SBB cut-off, as part of the preparatory work for the TP3 Uplans between Tavannes and Biel on the N16 in Switzerland, for the TP3 Infra Tunnel SA – Bieri & Grisoni S.A. consortium. With the help of Gyger Levages, the 27-mm VMD temporary bridge designed and installed by LOCAPAL …
Temporary bridge, Roquevaire
LOCAPAL installed a temporary bridge in Roquevaire on behalf of BTPS Méditerranée. The operation took place over two nights, to minimize disruption to traffic on the main road leading to the town. The bridge components were pre-assembled off-site, in Creil, to speed up on-site installation. The temporary structure is part of the work carried out by the Aix-Marseille-Provence Metropolitan Authority …
VMD Bridge – Modane, 73
Locapal VMD bridge installation We transported three 31.60m sections and assembled them side by side on site. Leased for one year, this temporary structure is extremely useful, as it is used to divert an engineering structure that will be demolished and then rebuilt (new bridge over the Saint-Antoine) at Modane. Thanks to the team for the availability of materials, the …