River boom – Pont de Charmes, 07

Christelle ValentinRiver and sea booms Leave a Comment

De-icing operation for our PRS used in the construction of the new two-way Charmes-sur-Rhône bridge. The construction of this two-lane bridge will ultimately make traffic between the Ardèche and Drôme departments safer and more fluid. Phase 1 of the project began in spring 2022, with the construction of support structures (piles, piers, abutments, etc.). Our PRS1300s are used to create …

VMD Bridge – Modane, 73

Christelle ValentinTemporary bridge Leave a Comment

Locapal VMD bridge installation We transported three 31.60m sections and assembled them side by side on site. Leased for one year, this temporary structure is extremely useful, as it is used to divert an engineering structure that will be demolished and then rebuilt (new bridge over the Saint-Antoine) at Modane. Thanks to the team for the availability of materials, the …

Butonnage – Edenn construction site, Nanterre, 92 – CARDEM

fpoulletShoring Leave a Comment

Buttressing during demolition work The LOCAPAL team is currently working on the construction of a HEB steel abutment in Nanterre, boulevard des Bouvets, to support the concrete walls on two basement levels. This is to enable the demolition of a building and maintain the sides. Our profiles are frequently used in a variety of applications: Rental – Weatherstripping for shoring …

High-level shoring – Kirchberg water tower, Luxembourg

Christelle ValentinShoring Leave a Comment

High-level shoring for the construction of a water tower Today, we’re getting a bit higher, 25 meters above the ground to be precise. We’re on site to help form a slab for a water tower in Luxembourg. The constraints are as follows: – Provide a 25m-high work platform capable of taking the load of 2 levels of slabs and intermediate …