High-level shoring – Kirchberg water tower, Luxembourg

Christelle Valentin Shoring Leave a Comment

High-level shoring for the construction of a water tower Today, we’re getting a bit higher, 25 meters above the ground to be precise. We’re on site to help form a slab for a water tower in Luxembourg. The constraints are as follows: – Provide a 25m-high work platform capable of taking the load of 2 levels of slabs and intermediate …

Shoring up a building to be demolished – Chantier PB10, Puteaux, 92 – PETIT

fpoullet Shoring Leave a Comment

Locapal designed and installed temporary bracing structures in reused steel for a building comprising three wings previously connected by intermediate wings. This operation was carried out as part of demolition and renovation work on office buildings in the Paris-Puteaux La Défense area, on behalf of Entreprise PETIT. The customer demolished these intermediate wings, then the interior of the 3 main …