High-level shoring – Kirchberg water tower, Luxembourg
High-level shoring for the construction of a water tower Today, we’re getting a bit higher, 25 meters above the ground to be precise. We’re on site to help form a slab for a water tower in Luxembourg. The constraints are as follows: – Provide a 25m-high work platform capable of taking the load of 2 levels of slabs and intermediate …
Demolition shoring – Site Ligne 3 Tramway Porte de Champerret, 75
As part of the redevelopment and extension of the T3 Porte d’Asnières / Porte Dauphine tramway line, Locapal installed an underpinning system to support part of the tunnel cover slab. In fact, the tunnel roof was cut into two parts, one to be retained to create a fire passage and the other to be demolished. The Locapal solution involves underpinning …
Shoring up a building to be demolished – Chantier PB10, Puteaux, 92 – PETIT
Locapal designed and installed temporary bracing structures in reused steel for a building comprising three wings previously connected by intermediate wings. This operation was carried out as part of demolition and renovation work on office buildings in the Paris-Puteaux La Défense area, on behalf of Entreprise PETIT. The customer demolished these intermediate wings, then the interior of the 3 main …