Traffic decking – NCHPG, Monaco

Christelle Valentin Decking, Site installation Leave a Comment

Traffic decking in metal framework, made to measure and supplied on a rental basis. Firstly, this decking will make it possible to widen the roadway for site machinery without disrupting traffic underneath. This structure will then be used to prime the future roadway, which will support the formwork for future structural work. Monaco is the scene of very high-density operations: …

Formwork tables – L16 Saint-Denis Pleyel station

Christelle Valentin Shoring Leave a Comment

Installation of eleven formwork tables Assembly of the first section of Locapal formwork tables at Saint-Denis Pleyel station on line 16. We have installed eleven formwork tables since 14/11/2022. The first six tables were assembled earlier, and our customer was able to pour 315 m³ of concrete on them. The last five tables were erected in November/December 2022. Turnkey formwork …

Heavy crane boom – M10VP construction site, Paris-Austerlitz, 75 – CHANTIERS MODERNES CONSTRUCTION

fpoullet Lifting Leave a Comment

To enable the construction of new housing, the M10VP project aims to cover the railroad line linking the Gare d’Austerlitz with a concrete slab of almost 10,000 m². The slab is supported on concrete beams positioned above the tracks by a Mediaco LR1600 lattice crane and LTM1750 telescopic crane. A complex project, impossible without the LOCAPAL-designed boom to spread …

Gantry crane – Tour Triangle chantier Besix, Paris Porte de Versailles, 75

fpoullet Lifting, Site installation Leave a Comment

BATIMAT, indirectly, here we are! Locapal built a crane gantry and a pedestrian protection tunnel at the entrance to the Parc expo Paris Porte de Versailles as part of the BESIX worksite for the construction of the Triangle Tower. Designed by Locapal Engineering and Methods. The project, located in the heart of Paris’s 15th arrondissement, is scheduled for completion in …

River boom – Pont de Charmes, 07

Christelle Valentin River and sea booms Leave a Comment

De-icing operation for our PRS used in the construction of the new two-way Charmes-sur-Rhône bridge. The construction of this two-lane bridge will ultimately make traffic between the Ardèche and Drôme departments safer and more fluid. Phase 1 of the project began in spring 2022, with the construction of support structures (piles, piers, abutments, etc.). Our PRS1300s are used to create …

VMD Bridge – Modane, 73

Christelle Valentin Temporary bridge Leave a Comment

Locapal VMD bridge installation We transported three 31.60m sections and assembled them side by side on site. Leased for one year, this temporary structure is extremely useful, as it is used to divert an engineering structure that will be demolished and then rebuilt (new bridge over the Saint-Antoine) at Modane. Thanks to the team for the availability of materials, the …

Butonnage – Edenn construction site, Nanterre, 92 – CARDEM

fpoullet Shoring Leave a Comment

Buttressing during demolition work The LOCAPAL team is currently working on the construction of a HEB steel abutment in Nanterre, boulevard des Bouvets, to support the concrete walls on two basement levels. This is to enable the demolition of a building and maintain the sides. Our profiles are frequently used in a variety of applications: Rental – Weatherstripping for shoring …

High-level shoring – Kirchberg water tower, Luxembourg

Christelle Valentin Shoring Leave a Comment

High-level shoring for the construction of a water tower Today, we’re getting a bit higher, 25 meters above the ground to be precise. We’re on site to help form a slab for a water tower in Luxembourg. The constraints are as follows: – Provide a 25m-high work platform capable of taking the load of 2 levels of slabs and intermediate …